Cable stayed bridge over Adige river

Adige - 2006-2007

Motorway bridge with one 310 m span and two lanes in each direction. The structure is with cables and mixed steel-concrete planking.

The main trestles are made of reinforced concrete while the anchorage heads for the cables are made of steel.
Technical Sheet
Performed service
Structural detail design consulting for technical cencter service RPA Engineering Consultans S.r.l.
Client
Society Autostrada Brescia Verona Vicenza Padova
Year
2006-2007
Dimensional parameters
Total Span 310m
Cost of the project
60.000.000 €

Articles

Photogallery

MJW structures

We design large scale and spatial integrated structures.