Footbridge in Pireo

Athene - 2006

The span of the planking is 45.5 metres and the width is 6.4 metres.

The planking is supported by a system of cables anchored to a variable section 25 metre high pylon and composed of box shaped steel profile.

The pylon is across the planking without any type of constraint and is stabilized by two cables on the back.

The lateral stabilization of the planking is ensured by two bracing frames that are part of the steps to access the footbridge.
Technical Sheet
Performed service
Structural detail design
Client
Pireo harbor municipality
Year
2006
Dimensional parameters
Total Span 45.5m
Cost of the project
1.000.000 €