New Juventus Stadium

Turin - 2008-2010

The stands are made by reinforced concrete frames and reinforced concrete or steel step support beams.

The groups of frames are made solid by extremely stiff plankings and by the continuity of the beam elements.

The hanging system with cables is formed by two pairs of trusses placed on the vertical of the 4 sides of the football pitch and supported in each one of the 4 vertex nodes, by a group of high resistant steel closed spiral cables (4x105 vertex group).

These groups of internal cables converge in pairs on the top of an upturned V trestle with a base of about 45 metres and height of about 84 metres and continue in a group of 6105 external cables that is anchored on the ground.
Technical Sheet
Performed service
Structural preliminary design, structural final design, structural detail design
Client
Juventus F.C.
Year
2008-2010
Dimensional parameters
42 000 Seats
Surface
20 800 m2 covered area
Cost of the project
105.000.000 €